100mm Underground Pipe Work Repair Case Study
Contractor Plus logo N.A.D.C logo Safe Contractor Approved logo Constructionline Gold Member logo

100mm Underground Pipe Work Repair Case Study

Commercial client reported repeated blockages on staff toilets. On completion of the clearance works, a CCTV survey was recommended and actioned and the cause of the blockages was traced to a failed connection on underground drainage pipework between the property to the manhole.

The Course Of Action

Engineers to excavate and repair fault.

Work Undertaken

Attended the site and traced the exact location of the fault. The defective section of pipework was excavated, exposed, removed and replaced with new 100mm UPVC pipework and relevant couplings. The flow was then tested and backfilled/re-instated the excavation.

The Outcome

Blockages ceased and toilets are now 100% working.

  • Our prices can be up to 30% lower than our Central London competitors
  • Latest equipment and highly experienced engineers
  • Open 24 hours a day, 7 days a week
Fast response times

Guaranteed on site within two hours

Problems with your drains?

Get in touch with our team today

Areas We Cover

We have engineers covering London, Central London and the Home Counties

Top

By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyse site usage, assist in our marketing efforts, and for personalised advertising.

More Information Accept All Cookies