Needed to excavate back inlet rainwater gully and install new pipework – approximately 3m to connection – as this was displaced.

The Course Of Action

Engineers to remove faulty manhole frame and cover and replace with new vehicular compliant unit.

Work Undertaken

2 engineers attended the site to excavate inside the garage area, remove the gully and chase pipe work downstream to the displaced joint. The faulty section of pipe work was removed. New UPVC gully and pipe work was installed, connecting to the existing vitrified clay. Ground was reinstated as original.

The Outcome

Client is particular and wants newly installed pipe work to be surrounded in pea shingle and compacted properly as there is already movement on the garage wall.

  • Our prices can be up to 30% lower than our Central London competitors
  • Latest equipment and highly experienced engineers
  • Open 24 hours a day, 7 days a week
Fast response times

Guaranteed on site within two hours

Problems with your drains?

Get in touch with our team today

Areas We Cover

We have engineers covering London, Central London and the Home Counties

Top

By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyse site usage, assist in our marketing efforts, and for personalised advertising.

More Information Accept All Cookies